What Happens at Colour and Inclusion Selections
Selections is the appointment where your house stops being a drawing and becomes a specific building. It is also the point where a great many decisions land at once, and preparation makes a larger difference to the outcome than taste does.
What actually happens on the day?
You work through the house systematically with a consultant, settling everything the contract has not already nailed down, with a figure attached to each decision at the moment you make it instead of a total appearing later.
Expect several hours, occasionally spread across more than one visit. The outside of the house is normally resolved first, because the facade, brickwork, render and roof set a palette that everything indoors then has to sit against. Then flooring, tiling, paint and door hardware. Then the kitchen in detail, then the electrical plan. It helps to know that not every decision carries equal weight. A handful of them, principally anything structural or built in, will outlast your ownership of the house. Most of the rest can be changed in a decade for a manageable sum. Recognising which category a choice belongs to, in the moment, is the most useful discipline you can bring into the room, and it stops the appointment being exhausting by the third hour.
One practical note before you go. Ask whether you can take samples away rather than deciding entirely in the showroom. Most consultants will allow it for the major surfaces, and seeing a floor sample in the actual orientation your living room will have, at the time of day you use the room, resolves more doubt than any amount of deliberation under downlights. The reason it takes so long is not indecision. It is that the number of individual choices is genuinely large, and each one interacts with the others. A tile that looked exactly right against one benchtop can read quite wrong against another, and the only way to know is to put them together.
When it is finished, the whole schedule is written up, costed and signed, and it forms part of the building contract from that point on. Changing something afterwards is a variation with a cost attached, which is why the preparation matters.
How should you prepare?
Six things worth doing in the weeks before, all of which reduce the pressure on the day itself.
Decide who decides
If two of you are building, agree in advance who has the final say on what. Disagreement in the appointment is the single largest cause of it running long or ending unresolved.
Visit showrooms first
Look at tiles, flooring and tapware in your own time before the appointment. Arriving with a shortlist is far easier than forming opinions under time pressure.
Collect images of what you like
A folder of rooms you respond to communicates more to a consultant in two minutes than a conversation about taste does in twenty.
Know your budget for upgrades
Decide beforehand what you are willing to spend above the standard range, so you are making trade-offs against a number rather than against a feeling.
Walk your current home
Write down what frustrates you about it. Too few power points, a dark corner nobody uses, nowhere sensible to store the vacuum, a bathroom with no ventilation. These irritations are precisely what selections can design out, and they are far easier to recall standing in the room than sitting in a showroom.
Bring your plan
Marked up with where furniture will go, which determines where power points, lighting and television points should actually be.
What gets chosen, and in what order?
Roughly this sequence, because each stage constrains the next.
| Stage | What you choose | Why it comes here |
|---|---|---|
| Externals | Facade, brick or render, roof, garage door, gutters | Estate rules apply here, and it sets the palette |
| Flooring | Timber, tile, carpet, and which rooms get which | Largest visual area, everything else works around it |
| Wet areas | Tiles, tiling height, tapware, shower screens, vanities | Most expensive rooms per square metre |
| Kitchen | Joinery, benchtop, splashback, appliances, handles | Most decisions in one room, and the most scrutinised |
| Paint and doors | Wall colours, trim, internal doors and hardware | Ties the interior together once surfaces are set |
| Electrical | Power points, lighting, data, television points | Needs the furniture plan, so it comes last |
Swipe the table sideways to see every column.
Our designs and inclusions page sets out what is already included before you begin.
What do people wish they had done differently?
Questions about the selections process
Ask us for the standard inclusions list well before your appointment so you know exactly what you are choosing between.
Ask us about your buildHow long does the selections appointment take?
Can I change my selections afterwards?
What should I bring with me?
Are upgrades worth it?
What if I do not know what I want?
Want the inclusions list before you decide?
Ask us for the full standard specification with brands and models named. Knowing what is already included is the best possible preparation for selections.