An advertised starting price is a marketing instrument, not an offer. It describes the least expensive version of a home on the most cooperative possible block, and the distance between it and your contract is normally large enough to change what you can afford.

Full scope quoted Nothing hidden VBA registered
A completed new home in Melbourne priced from a full contract rather than an advertised figure
The anatomy

What is an advertised price actually describing?

A base house, at the entry specification, on a hypothetical flat rectangular lot with good soil, services conveniently placed and no estate requirements worth mentioning.

Every one of those assumptions is doing work. Change the soil and the slab changes. Introduce a fall and levelling appears. Move the services and the connection run lengthens. Add estate facade rules and the cheapest elevation is no longer available to you.

Worth noting too is what the advertised figure assumes about the block that is not stated anywhere. A standard allowance for ground works is built on a flat rectangular lot with cooperative soil and services close at hand. Very few real blocks match all three conditions, and every departure from them adds cost that the headline never contemplated. Then there is the specification itself. The photographs beside an advertised price almost never depict the entry range, because the entry range does not photograph well. Flooring, tiling height, tapware, appliances and joinery in the imagery are typically upgrades.

It is worth naming the incentive honestly. Advertised pricing exists to generate enquiries, and whoever posts the lowest starting figure attracts the most attention regardless of what the eventual contract looks like. That pressure pushes the whole industry towards leaner headline numbers rather than fuller ones, which is why comparing advertisements tells you which company markets most aggressively rather than which builds most economically. None of this is unlawful and much of it is standard practice across the industry. It becomes a problem only when a buyer treats the figure as a quote and builds a budget on it, which is exactly what the presentation encourages.

New homes on a completed street in a Melbourne estate
Decoding

How do you read an advertised price?

Six questions that convert a headline number into something meaningful. Ask them in this order.

01

Does it include land?

Some advertised packages include a lot, some price the house alone. If land is included, ask which lot, because a package price without a specific block is not a price at all.

02

What site works are in it?

Ask whether the figure assumes a standard allowance or has been priced against a soil report. If no test has been done, the answer is that site works are not in it.

03

Which facade is shown?

Advertised prices usually attach to the most basic elevation. Confirm whether the facade in the imagery carries an additional cost and whether the estate would even permit the basic one.

04

What is the specification level?

Ask whether the flooring, tiling, tapware and appliances shown are standard or upgrades, then ask for the standard list in writing.

05

What is excluded entirely?

Driveway, fencing, landscaping, window coverings, letterbox and clothesline are the usual omissions. Ask directly, insist on the reply in writing, and treat a vague verbal assurance as a no.

06

How many allowances remain?

Count the prime cost and provisional sum items. Each is a figure that can still move after you have committed.

The gap

Where does the difference usually come from?

Five categories account for most of the distance between an advertised figure and a signed contract.

CategoryWhy it is not in the advertised priceWhen you find out
Site worksGenuinely unknown until a block is testedAfter the soil report, often post-deposit
Specification upgradesThe base range is what is pricedAt selections, item by item
Estate requirementsVary by developer and by estateWhen the design goes for approval
Finishing itemsConventionally outside the building contractAt handover, or when you try to move in
Allowance shortfallsThe allowance was an estimate, not a selectionAt selections and again at reconciliation

Swipe the table sideways to see every column.

Every one of these can be established before you sign anything. Not one of them can be established from an advertisement, which is precisely the difficulty with using advertisements to choose a builder.

A family who compared complete quotes before building in Melbourne
The fix

How do you force a fair comparison?

Hand each builder an identical brief and an identical block, then set the finished contracts beside one another instead of the advertised figures. It costs nothing and it transforms the discussion.

Specify that quotes must include site works priced from a soil test on the actual lot, a named inclusions list rather than categories, and an explicit statement of what falls outside the contract. Ask each builder to list their prime cost and provisional sum items with values.

One further discipline helps. Ask each builder to state, in a single line, the total of every prime cost and provisional sum item in their contract. That figure tells you how much of the price is still genuinely undecided, and it is frequently the clearest single indicator of whether a quote will hold. A contract with a small allowance total is a contract where most decisions have already been made and costed. Some builders will decline, or will want a deposit before doing that work. That response is itself informative. A builder confident in their pricing is generally comfortable being compared on it.

Then compare like with like. The higher number frequently turns out to be the cheaper house, because it already contains items the other quote will add later. Our five point comparison framework covers how to test the rest of it.

'From' price FAQ

Questions about advertised prices

Send us an advertised package you are considering and we will tell you what it does and does not appear to include.

Ask us about your build
Is a 'from' price dishonest?
Not usually, and it is standard practice across the industry. It describes a real base house at a real base specification. The difficulty is that it is presented alongside imagery of an upgraded home on a hypothetical ideal block, which invites a reader to assume more is included than actually is. It becomes a problem when treated as a quote rather than as a starting point.
How big is the gap typically?
Large enough to change what you can afford, which is the honest answer. It varies enormously because the biggest component, site works, depends entirely on your block. On a flat lot with good soil and a base specification the gap can be modest. On reactive clay with a fall, an estate facade requirement and a specification matching the photographs, it is substantial.
What should I ask when I see an advertised price?
Six things: does it include land and which lot, are site works priced from a soil test, which facade does it assume, is the specification shown standard or upgraded, what is excluded entirely, and how many allowances remain in the contract. Ask for all of it in writing. A builder who answers readily is telling you something useful about how the rest of the project will run.
Why do your quotes look higher?
Because more is inside them. Ground works are calculated against testing done on your own land instead of a blanket figure, and fittings are listed by make and model rather than by category. The result reads dearer at proposal stage and lands far closer to reality at completion. What deserves comparing is the finished total, not the headline.
Can I ask a builder to quote on someone else's plan?
Absolutely, and few exercises are more revealing. Hand over the drawings and the inclusions schedule somebody else prepared, and we will cost that identical dwelling on that identical parcel, ground works counted and every fitting specified by name. Only when two contracts describe precisely the same scope does holding them side by side prove anything.

Comparing advertised packages?

Forward whichever ones are on your shortlist. We will spell out what each appears to cover, then cost the identical dwelling on the identical block so you are comparing genuine equivalents.

Leave a Reply

Your email address will not be published. Required fields are marked *