Our Building Process, stage by stage
A new home runs through six stages, and the money follows the work rather than arriving upfront. This page sets out what happens at each one, what you are asked to approve, what your lender releases and roughly how long it takes, so nothing about the sequence is a surprise.
What are the six stages of a new build?
Construction itself is only the last of them. The four before it are where projects are won or lost.
What happens before you are asked to commit?
The first conversation is about your position rather than our plans. Do you have land or are you looking? What is the budget, and does it include the land? Who is your lender and what have they approved? That determines which path applies, and there is no point discussing floor plans before it is settled.
The second stage is where we do the work most builders defer. We order a soil test and a feature survey of the block, obtain the title and the planning property report, and read whatever the estate or the council requires.
That produces the information a real price depends on: the soil classification that determines the slab, the levels that determine cut and fill, whatever easements or overlays constrain the footprint, and the design requirements the home must satisfy.
Only then do we draw and price. It is slower at the start and considerably faster afterwards, because nothing needs revisiting once construction is underway.
What do you decide at tender and approvals?
Tender is where the house stops being a drawing. Structural changes are confirmed and priced, then you work through selections: facade and roof, flooring and tiling, kitchen joinery and appliances, tapware, paint, and the electrical plan covering power points, lighting and data.
Every choice is priced as it is made rather than accumulated into a bill at the end. When selections are complete the figure goes into the contract and is fixed, and our designs and inclusions page explains how to read what is in it.
Approvals follow. We lodge for the building permit, arrange domestic building insurance, obtain estate design approval where an estate is involved, and where a planning permit is required that process runs alongside.
Your lender completes its own steps in parallel, valuing the project and setting up the drawdown schedule. On a rebuild, demolition and service abolishment also happen in this window.
What happens at each construction stage?
Five milestones, each inspected before your lender releases the payment attached to it.
| Stage | What gets built | What it means for you |
|---|---|---|
| Base | Site set out, footings and slab poured | The first construction claim, and the point the house stops being theoretical |
| Frame | Structural frame erected, roof trusses set | You can walk the rooms for the first time and understand the proportions |
| Lock-up | Roof on, windows and external doors installed | The building is weathertight and the interior work can begin |
| Fixing | Internal linings, doors, cabinetry, skirting | The house starts looking finished, and most selections become visible |
| Completion | Final fit-off, tiling, painting, clean | Everything is finished ready for inspection and handover |
Swipe the table sideways to see every column.
Payments are claimed as each stage completes and are inspected before release, which protects you as much as it does us.
What happens at handover and afterwards?
Six things that occur at the end of the build and in the months following it.
Where do builds actually go wrong?
Questions about how a build runs
Ask us anything about the sequence, the timing or what you would be signing at each point.
Ask about the processHow long does the whole process take?
When do I actually pay?
What do I approve along the way?
Can I visit the site during construction?
What happens if something is wrong at handover?
What if I want to change something mid build?