A new home runs through six stages, and the money follows the work rather than arriving upfront. This page sets out what happens at each one, what you are asked to approve, what your lender releases and roughly how long it takes, so nothing about the sequence is a surprise.

You approve every stage Payments follow the work VBA registered
New home under construction partway through the build process in Melbourne
Overview

What are the six stages of a new build?

Construction itself is only the last of them. The four before it are where projects are won or lost.

OneDiscoveryBudget, land status and which build path fits
TwoAssessmentSoil test, survey, title and planning checks
ThreeTenderDesign finalised, selections made, price fixed
FourApprovalsPermits, insurance and finance in place
FiveConstructionBase, frame, lock-up, fixing, completion
SixHandoverInspection, keys and the defects period
Stages one and two

What happens before you are asked to commit?

The first conversation is about your position rather than our plans. Do you have land or are you looking? What is the budget, and does it include the land? Who is your lender and what have they approved? That determines which path applies, and there is no point discussing floor plans before it is settled.

The second stage is where we do the work most builders defer. We order a soil test and a feature survey of the block, obtain the title and the planning property report, and read whatever the estate or the council requires.

That produces the information a real price depends on: the soil classification that determines the slab, the levels that determine cut and fill, whatever easements or overlays constrain the footprint, and the design requirements the home must satisfy.

Only then do we draw and price. It is slower at the start and considerably faster afterwards, because nothing needs revisiting once construction is underway.

Assessing a block during the early stages of the build process
Selections and finishes chosen during the tender stage of a new home build
Stages three and four

What do you decide at tender and approvals?

Tender is where the house stops being a drawing. Structural changes are confirmed and priced, then you work through selections: facade and roof, flooring and tiling, kitchen joinery and appliances, tapware, paint, and the electrical plan covering power points, lighting and data.

Every choice is priced as it is made rather than accumulated into a bill at the end. When selections are complete the figure goes into the contract and is fixed, and our designs and inclusions page explains how to read what is in it.

Approvals follow. We lodge for the building permit, arrange domestic building insurance, obtain estate design approval where an estate is involved, and where a planning permit is required that process runs alongside.

Your lender completes its own steps in parallel, valuing the project and setting up the drawdown schedule. On a rebuild, demolition and service abolishment also happen in this window.

Construction

What happens at each construction stage?

Five milestones, each inspected before your lender releases the payment attached to it.

StageWhat gets builtWhat it means for you
BaseSite set out, footings and slab pouredThe first construction claim, and the point the house stops being theoretical
FrameStructural frame erected, roof trusses setYou can walk the rooms for the first time and understand the proportions
Lock-upRoof on, windows and external doors installedThe building is weathertight and the interior work can begin
FixingInternal linings, doors, cabinetry, skirtingThe house starts looking finished, and most selections become visible
CompletionFinal fit-off, tiling, painting, cleanEverything is finished ready for inspection and handover

Swipe the table sideways to see every column.

Payments are claimed as each stage completes and are inspected before release, which protects you as much as it does us.

Handover

What happens at handover and afterwards?

Six things that occur at the end of the build and in the months following it.

Practical completion inspectionWe walk the home with you and record anything requiring attention before you take possession.
Final payment and keysThe last claim is made, the final payment is released and the home is handed over to you.
Documentation packWarranties, manuals, certificates and the occupancy permit, all provided together rather than chased later.
The defects liability periodA defined period after handover during which we return and rectify defects that appear in the work.
Structural warrantyLonger term protection under Victorian law and your domestic building insurance, covering structural matters.
Settling and maintenanceNew homes move slightly as materials settle. Minor cracking is normal, and we explain what to expect and what to report.
Worth knowing

Where do builds actually go wrong?

Approving selections lateSelections that drag hold up ordering, and a delayed cabinetry order delays fixing stage. It is the most common self inflicted delay.
Variations requested mid buildA change at frame stage costs far more than the same change at tender. Decide structural matters before construction starts.
Finance approval expiringApprovals have a shelf life, and on registering land the wait can outlast them. Keep your broker informed of titling dates.
Assuming site costs are a formalityOn a block that has not been tested, they are unknown rather than small. Insist on a soil report before signing anything.
Process FAQ

Questions about how a build runs

Ask us anything about the sequence, the timing or what you would be signing at each point.

Ask about the process
How long does the whole process take?
Where the title already exists, budget somewhere between four and six months of on site work for a single level house, more for two storeys, and add the earlier weeks spent on assessment, tender, approvals and lending. If the lot has yet to register, that delay precedes everything else and frequently dominates the schedule. Established suburbs needing a planning permit add a further stretch before anything begins. We provide dated milestones with the quote.
When do I actually pay?
In stages that follow the work. A payment accompanies signing the build contract, after which the bank pays out against each completed and inspected milestone in turn. Interest accrues only against money actually advanced, so what you owe each month begins modestly and rises as the house does. Nothing substantial is paid before work exists to justify it.
What do I approve along the way?
The design and any structural changes at tender, then every selection you make, each priced at the time. After that you approve any variation you request in writing before the work proceeds. At the end you sign off practical completion after we walk the home together. You are not asked to approve anything retrospectively.
Can I visit the site during construction?
Yes, by arrangement. Site visits at agreed times let you see progress and ask questions, and we would encourage them at frame stage in particular, since that is when the proportions of the rooms first become real. Unannounced visits are a safety issue on an active site, so we ask that they are arranged rather than spontaneous.
What happens if something is wrong at handover?
It goes on the list at the practical completion inspection and is rectified. Beyond that, the defects liability period exists precisely so that issues appearing in the first months after you move in are our responsibility to fix. Longer term structural matters are covered by your domestic building insurance and the protections in Victorian law.
What if I want to change something mid build?
It is possible, and it is quoted before anything happens. You approve the variation in writing, including its cost and any effect on the programme, and only then does the work proceed. The honest advice is to resolve structural decisions at tender, because the same change costs considerably more once framing is up.