Cost & inclusions

New Home Inclusions: what should be in the price

An inclusions list is the most useful document a builder will give you and the one buyers read least carefully. Work through it room by room rather than skimming it, and the differences between two quotes that looked similar become obvious very quickly.

Named brands and models Nothing left vague VBA registered
Interior finishes and inclusions in a completed Melbourne home
The principle

What separates a real list from a thin one?

Specificity. A real inclusions list names products. A thin one describes categories and leaves the choosing until after you have committed.

Compare two entries. One says quality stainless steel appliances. The other names the brand, the model number and the size of the oven, the cooktop and the rangehood. Only the second is a commitment, and only the second can be compared against another builder's list.

The same applies throughout. Tiling described as to selected areas tells you nothing about height or extent. Flooring described as quality floor coverings does not say which rooms get what. Tapware described as designer is a word rather than a specification.

There is a practical test worth applying as you read. For each line, ask whether a different person at the same company could substitute a cheaper product and still be complying with what is written. If the answer is yes, the line is a category rather than a commitment, no matter how appealing the adjective attached to it. Applying that single question to a specification usually takes ten minutes and reveals more than any amount of showroom time. None of this means a list with allowances is dishonest. Allowances have a legitimate place for items you genuinely have not chosen. The things to weigh are the quantity of them, whether each sum is set at a level that buys anything decent, and whether the consequential choices have already been locked down.

Open plan living area showing finished inclusions in a Melbourne home
The audit

How do you audit an inclusions list?

Six rooms, in the order they usually reveal the most. Work through each with the list in front of you.

01

The kitchen

Are the appliances named by model? Is the benchtop material and thickness stated? Does the joinery include a pantry, and is soft close hardware specified or assumed? The kitchen is where thin lists show up first.

02

Bathrooms and ensuite

How high does the tiling go, and to which walls? Is the shower screen framed or frameless? Are the tapware and the toilet suites named? Are niches, shaving cabinets and heated towel rails included or extra?

03

Flooring throughout

Which rooms receive which floor covering, and what is the underlay? A list saying tiles to wet areas and carpet elsewhere leaves the living areas ambiguous, which is usually deliberate.

04

Doors, windows and hardware

Are internal doors solid or hollow core? Is the entry door a standard size? Are windows double glazed, and are flyscreens and locks included on all of them?

05

Electrical and heating

How many power points per room, and where? Are downlights included throughout or in nominated areas? Is the heating and cooling ducted and zoned, and how many outlets?

06

Outside the house

Driveway, paths, fencing, letterbox, clothesline and landscaping. These are the most commonly excluded items in the entire contract and the most visible when missing.

Commonly missing

What gets left out most often?

Six items buyers routinely assume are included and frequently are not.

ItemWhy it gets missedWhat to ask
Driveway and pathsSometimes included, often notIs concrete to the garage and front door in the price?
FencingUsually excluded from the build contractWhich boundaries, and to what height and material?
LandscapingAlmost always excluded unless turnkeyIs front and rear included, and by when must it be done?
Window coveringsRarely in a base contractBlinds to every window, or a nominated allowance?
Flyscreens and locksAssumed on all windows, often on someWhich windows and doors, exactly?
Site clean and rubbish removalAssumed present, occasionally notWill the block be swept, cleared of debris and free of builder waste on the day you take the keys?

Swipe the table sideways to see every column.

Estate design guidelines frequently make landscaping and fencing compulsory within a set period, so budget them even where the contract excludes them.

A home being fitted out during the fixing stage of construction
Comparing

How do you compare two inclusions lists?

Put them side by side and go line by line rather than reading each in isolation. Differences that are invisible in a single document become obvious in a comparison.

Where one list names a product and the other names a category, treat the category as the lower specification, because that is what it will be. Where one includes an item and the other omits it entirely, price the omission and add it to the second quote before comparing totals.

It also pays to check what each list says about quantities rather than only about products. Ten downlights and twenty downlights can both be described as downlights throughout. Two power points in a bedroom and four are both simply power points. Quantity is where two specifications naming identical products can still deliver noticeably different houses, and it is the detail buyers most often discover at handover rather than at contract. Then count the allowances in each and add up their values. A quote with a lower headline and a larger allowance total is not cheaper, it is less decided, and undecided figures move in one direction after contract.

Our designs and inclusions page covers what we include as standard, and we are happy to be compared line by line against anybody.

Inclusions FAQ

Questions about what should be included

Forward any builder's specification and we will point out where it binds them and where it leaves them room.

Ask us about your build
What should always be named rather than described?
Appliances, tapware, tiles, flooring, door hardware, the benchtop material and the heating and cooling system. Each of these has a wide price range, and a category description lets a builder supply the cheapest option within it. If the list says brand and model, you know what you are getting. If it says quality or premium, you know nothing at all.
Is an allowance a bad sign?
Not by itself. Allowances are a legitimate way to handle items you genuinely have not chosen yet, such as tiles or tapware where you want time to decide. The signal to watch is the number of them and their combined value. A contract with a handful of modest allowances is normal. One with many large allowances is a price that has not really been settled.
What are the most commonly excluded items?
Driveway, fencing, landscaping and window coverings, in roughly that order. Flyscreens, letterboxes and clotheslines follow closely behind. These are also the items estate design guidelines frequently require you to complete within a set period after handover, so excluding them from the contract does not exclude them from your obligations or your budget.
How do I compare two lists that use different wording?
Convert both into the same categories and go room by room. Where one names a product and the other describes a category, assume the category means the cheapest acceptable option. Where an item appears on one list and not the other, obtain a price for it and add it to the quote that omitted it. Only then are the two totals comparable.
Should everything be decided before I sign?
As much as practically possible. Structural decisions certainly, because changing them later reworks the engineering. Major finishes ideally, since that is what converts a headline figure into a price that holds. Small selections can reasonably sit as allowances. The more that is decided at contract, the less there is to move afterwards, and movement after contract almost never goes in your favour.

Want a specification you can actually compare?

Ask us for a full inclusions list with brands and models named. Then hold it against anybody else's and see which one commits to more.

Leave a Reply

Your email address will not be published. Required fields are marked *