Cost to Build a New Home in Melbourne: the all-in figure

What a new home costs in Melbourne depends on far more than floor area. Five separate blocks make up the total: the land, the base build, the site works, your selections, and the finishing items most contracts exclude. Site works are the block that catches buyers out, because advertised prices almost never carry them.

Priced from your soil report Site works included No hidden allowances
Overhead view of new home construction used to explain build costs in Melbourne
The structure

What actually makes up the cost of a new home?

Almost every disappointment in new home budgeting comes from treating the build contract as the whole cost. The true cost to build a new home Melbourne buyers should plan around is the sum of five separate blocks. It is one of five blocks, and on many projects it is not even the largest.

The land is usually the biggest single number, and it varies more by location than anything else on this page. The base build is the house itself at the builder's standard specification. Site works are whatever your particular block demands before that house can stand on it. Selections are the difference between the standard range and what you actually choose. The finishing items are driveway, fencing, landscaping and window coverings, which contracts routinely exclude.

Add the fees, permits and insurances that sit around all of it, and you have the real figure. Anyone quoting you one number without telling you which of these blocks it covers is not giving you a budget.

New home mid construction showing the stages that make up build cost
The five blocks

Where does the money go on a new build?

What each block covers and what makes it move.

Cost blockWhat it coversWhat drives it up
LandThe lot itself, plus stamp duty on the land valueDistance to the city, corridor, frontage width, titled versus registering
Base buildThe house at the builder's standard specificationFloor area, single or double storey, facade complexity, articulation
Site worksMaking your block ready to build onSoil classification, fall across the site, rock, fill, retaining, service distances
SelectionsEverything above the standard rangeFlooring, tiling height, joinery, stone, appliances, tapware, electrical
Finishing itemsDriveway, fencing, landscaping, window coveringsFrontage length, estate requirements, whether the package is turnkey
Fees and holdingPermits, insurance, connections, interest during the buildCouncil, build duration, whether you rent while building

Swipe the table sideways to see every column.

Our designs and inclusions page covers what typically sits inside the base build and what does not.

Rather than publish a per square metre figure that dates quickly and varies enormously by block, we price your build from your own soil report, survey and selections. Ask us for a current range for the corridor and design you are considering, and we will give you one with the assumptions written next to it.

The gap

Why is the advertised price never the final price?

Because an advertised figure is built on assumptions that will not match your block. It describes a base house, on level ground, with good soil, services close by, and the builder's entry level specification throughout.

Work through what that leaves out. Your block will have a soil classification, and if it is reactive clay the slab costs more than the assumed one. It will have a fall, and beyond a modest amount that means cut and fill or retaining. Services sit at a real distance from where the house will stand. The estate may require a particular facade treatment. None of that is in the advertised number.

Then the specification. The flooring in the photographs is rarely the flooring in the base range. Nor is the tiling height, the tapware, or the appliance package. Each is a legitimate upgrade, and together they are usually the second largest gap.

This is not an argument against comparing prices. It is an argument for comparing complete quotes on your own block, which is the only comparison that means anything.

Site works

What drives site costs up or down?

Six factors decide what your block costs to build on. They are all knowable before you sign, which is why we test first and price second.

01

Soil classification

A geotechnical test classifies the ground, and the slab is engineered to that result. Reactive clay demands a stiffer, deeper and more expensive slab than stable sand. It is the single biggest site variable in Melbourne.

02

Fall across the block

Level ground needs almost nothing. A meaningful fall means cutting, filling, or stepping the floor level, and often retaining walls to hold the result in place.

03

Retaining and boundaries

Where levels change at a boundary, a retaining wall is structural rather than decorative. Shared boundaries also bring the neighbour, and sometimes their engineer, into the conversation.

04

Rock and fill

Rock has to be broken out and carted away. Uncontrolled fill from earlier works has to be removed or the footings taken down through it. Both are discovered by testing, not by looking.

05

Service connections

Water, sewer, power, gas and telecommunications are priced by the run from the connection point to the house. A long run, or a connection on the far boundary, adds real money.

06

Access

Narrow frontages, steep driveways, overhead power and street trees all affect how machinery and deliveries reach the site. Restricted access is slower and slower is dearer.

Soil

How does soil classification change the slab?

Classification describes how much the ground moves with moisture. The more it moves, the more the slab has to resist it.

ClassGround behaviourEffect on the slab
AStable sand or rock, very little movementThe most economical slab design
SSlightly reactive clayModest strengthening over class A
MModerately reactive clay or siltCommon across much of Melbourne, a noticeable step up in cost
H1 and H2Highly reactive claySignificantly deeper and stiffer, a substantial cost increase
EExtremely reactive clayThe most demanding standard classification, engineered individually
PProblem site, including fill or soft soilRequires a specific engineering solution such as piers or screw piles

Swipe the table sideways to see every column.

We order the soil test before pricing, so the classification is a known figure in your contract rather than an allowance that gets reconciled later.

Family moving into a completed new home in Melbourne after budgeting the full cost
Outside the contract

What costs sit outside the build contract?

A building contract covers construction. Several real costs sit either side of it, and forgetting them is how a budget that looked comfortable stops being comfortable.

Before the build there are permits and approvals, the soil test and survey, estate design approval where it applies, and domestic building insurance. On a rebuild there is demolition, service abolishment and any asbestos removal, which we cover on the build on your own land page.

During the build there are holding costs. If you are renting while your home goes up you are paying rent and loan interest at the same time, and the interest grows as more of the loan is drawn. The mechanics of that are set out on our first home buyer page.

After handover come the items excluded from most contracts: driveway if it is not included, fencing, landscaping, window coverings, and the small things that add up quickly. Budget them at the start, not when the keys arrive.

Reducing it

What genuinely lowers the cost of building new?

Six levers that make a real difference, roughly in order of impact.

Where you buy

Land is the largest single line, and it moves more by corridor than any other factor. Moving one suburb further out often buys more house than any specification decision.

A simpler footprint

Every corner, step and change of roof line costs money. A rectangular plan with a straightforward roof delivers more floor area for the same budget.

Grants and concessions

For eligible first home buyers, the grant plus duty assessed on land rather than a finished house is a direct reduction in what you must fund.

Single storey where it fits

On a wide enough lot, single storey costs less per square metre. Stairs, additional structure and extra wet areas all carry cost.

Choosing the standard range well

A builder with a genuinely good standard specification saves you more than a builder with a low base price and a long upgrade list.

A titled block

Titled land shortens the wait, which shortens the period of paying rent and interest together. Time is a cost like any other.

Worked example

How should you build your own cost estimate?

Six steps. Do them in this order and the number you finish with will be close to real.

Start with the landA specific lot in a specific estate, not an average. Note whether it is titled, and add duty on the land value.
Add the base build for a real planA named design at the builder's standard specification, matched to that lot's frontage.
Add site works from a soil testNot an allowance. If no test has been done, treat the whole line as unknown rather than as zero.
Add your selections honestlyWalk the standard range and mark everything you would change. Price those changes rather than hoping.
Add the excluded finishing itemsDriveway, fencing, landscaping and window coverings, unless they are named in the contract.
Add fees and holding costsPermits, insurance, connections, and rent plus interest for the months you will be building.
Worth knowing

What are the most common budgeting mistakes?

Treating the contract price as the totalIt covers construction. Land, fees, holding costs and the excluded finishing items sit outside it and are all real.
Assuming site costs will be modestThey vary by tens of thousands between neighbouring blocks. Until a soil test exists, that line is genuinely unknown.
Leaving no contingencyEven on a fixed price contract, variations you request cost money. A budget with nothing spare turns every decision into a compromise.
Comparing quotes of different scopesOne quote with site works and full inclusions will look dearer than one without. It is usually the cheaper house.
Design and cost

What makes one house cost more per square metre than another?

Two homes of identical floor area can be priced a long way apart. Six design decisions account for most of that difference, and every one of them is made before construction starts.

Shape and articulation

Every external corner adds framing, cladding, flashing and labour. A simple rectangular footprint delivers noticeably more floor area per dollar than a heavily articulated one, which is why the cheapest plans look plain from above.

Roof complexity

A straightforward gable or hip roof is far cheaper than one with multiple pitches, valleys and changes of direction. Complex roofs also carry a higher long term risk of leaks at the junctions.

Number of wet areas

Bathrooms, ensuites, powder rooms and laundries are the most expensive rooms in any house by area. Waterproofing, tiling, plumbing and fittings all concentrate there, so an extra bathroom moves the figure more than an extra bedroom.

Ceiling height

Raising ceilings lifts the cost of framing, plasterboard, painting, doors, windows and heating all at once. It transforms how a home feels, and it is one of the few decisions that cannot be retrofitted later.

Span and structure

Wide openings and large uninterrupted living spaces need steel rather than timber above them. Each beam carries engineering, supply and craneage, so open plan costs more than the plan alone suggests.

Facade treatment

Rendered and mixed material facades cost more than face brick, and many estates specify a minimum standard. Check the design guidelines before you fall for a facade, because the requirement is contractual.

If you are weighing two plans against each other, compare them on these six points rather than on floor area alone. See how the options differ on our designs and inclusions page.

Cost FAQ

Questions about what a new home costs

Send us a lot and a design and we will price it properly, with the assumptions written beside every line.

Get a costed quote
What should a new home cost to build here?
There is no single figure, because five separate blocks make up the total: land, the base build, site works, your selections, and the finishing items most contracts exclude. Land is usually the largest and varies most by corridor. Site works vary most between neighbouring blocks, driven by soil classification and fall. Rather than quote a per square metre number that dates quickly, we price from your actual soil report, survey and selections so the figure means something.
What are site costs and why are they not in the advertised price?
Site costs are the works needed to make your specific block buildable: the slab engineered to your soil classification, any cut and fill for a sloping site, retaining where levels change, rock removal, and the service connections from the boundary. Advertised prices exclude them because they cannot be known until a block is tested. That is reasonable, but it means an advertised figure is a starting point rather than a quote.
What is the difference between a prime cost item and a provisional sum?
A prime cost item is an allowance for a product you have not selected yet, such as tapware or tiles. If your choice costs more than the allowance you pay the difference at selections. A provisional sum is an estimate for work whose full scope is not yet known, and it is reconciled against actual cost once the work is done. Both are normal. A contract carrying many large allowances is one where the final figure can still move.
How does soil classification affect what I pay?
It determines the slab, which is one of the larger site cost items. Stable sand needs the most economical slab design. Moderately reactive clay, common across much of Melbourne, needs a stronger one. Highly and extremely reactive clay require significantly deeper and stiffer slabs again, and a problem site may need piers or screw piles. The difference between classifications on the same house can be substantial.
Is it cheaper to build single or double storey?
Single storey is generally cheaper per square metre, because a double storey home adds stairs, additional structural support and usually another bathroom. Double storey becomes the better value option when the block is narrow, since it delivers the same accommodation on a smaller footprint and leaves more yard. On a wide lot with no constraints, single storey usually wins on cost.
How much deposit do I need, and when is it paid?
It arrives in pieces rather than as one payment. Money goes down on the land at contract, a smaller amount goes down on the build, and the lender then funds construction milestone by milestone. Mortgage insurance usually enters the picture under a twenty per cent contribution, though schemes for first home buyers can soften that. The full sequence, including what you pay while building, is set out on our first home buyer page.
Do grants reduce what I have to fund myself?
For eligible first home buyers, yes, in two ways. The First Home Owner Grant applies to a new build and is typically paid during construction, and on a house and land purchase duty is normally calculated against the land alone instead of a finished dwelling. Amounts, caps and thresholds are legislated and revised periodically, so confirm the current position with the State Revenue Office Victoria before you build a budget around them.
How do I compare two builders' prices fairly?
Give both the same block and the same brief, and require site works to be included and every inclusion named. Then compare the totals rather than the headline figures. Also compare the number and size of the allowances in each contract, because a low price with many allowances frequently finishes higher than a fuller price with few.

Want a real number for your block?

Send us the lot and the design you have in mind. We will order the soil test, price the site works properly, and give you a figure with every assumption written beside it.