How to Choose a New Home Builder in Melbourne

Knowing what to check is the easy part. Actually doing it means requesting specific documents, asking questions in a form that cannot be answered vaguely, and being willing to walk away from a builder who will not answer them. This is how to run that process.

Happy to be compared Documents on request VBA registered
New homes under construction, illustrating the choice of builder in Melbourne
The approach

Why do most people choose badly?

Because the process is designed to be pleasant rather than informative. You visit display homes, you are shown finishes at their best, you are given a headline figure, and you are asked how soon you would like to start.

None of it is dishonest. Display homes are built to show what a builder can do at their best, and there is nothing wrong with presenting your strongest work. The difficulty is simply that it answers a question you were not really asking. Nothing in that sequence tells you what you actually need to know, which is how this company behaves when something goes wrong nine months from now. Display homes do not answer that. Renders do not. Neither does a friendly consultant.

The information that does answer it is documentary and it is available, but only if you ask for it specifically. A contract, an inclusions specification, an insurance certificate, a registration number and the phone number of somebody who has finished a build.

The good news is that requesting those five things is itself a test. A builder confident in their work produces them readily. Should someone hedge, postpone, or explain at length why such paperwork cannot be shared at this stage, you have learned more than any glossy brochure would have conveyed.

Interior of a completed new home in Melbourne
Documents

What should you request, and what should you see?

Five requests, and what a satisfactory response actually looks like in each case.

01

The registration number

Request the licence number alongside the full company name. Reassuring: both arrive without hesitation and correspond. Concerning: only a marketing name offered, or digits registered to a different corporate entity than the one preparing your agreement.

02

A sample contract

Ask to read one before you are asked to sign anything. Good answer: a recognised industry contract, sent without fuss. Poor answer: reluctance, or an in house document with unfamiliar limitation clauses.

03

A full inclusions specification

Good answer: brands and model numbers, room by room, with quantities. Poor answer: categories, adjectives, and the phrase or similar attached to everything.

04

The allowance schedule

Ask for every prime cost and provisional sum item with its value and total. Good answer: a short list with realistic figures. Poor answer: reluctance to total them, or a total that represents a large share of the price.

05

Client contacts

Ask for two who finished within the last year and one currently building. Good answer: names and numbers, with permission. Poor answer: testimonials instead, or only clients who finished years ago.

Reading answers

How do you interpret what you are told?

Five common responses and what each one usually means in practice.

What you hearWhat it often meansWhat to do
We include a generous site cost allowanceNo soil test has been done on your blockAsk for testing before contract, or treat the figure as unknown
That is a standard inclusionIt may be standard for them, not for the industryAsk for the brand and model in writing
This price is only available todayA sales tactic rather than a commercial realityTake the quote away and think about it regardless
We can sort the details laterDetails settled after contract are settled on their termsSettle what you can before signing
Our clients are very privatePossibly true, possibly nobody willing to speakAsk again, and note the answer either way

Swipe the table sideways to see every column.

The five checks themselves are set out on our comparing builders page.

A client outside a completed new home in Melbourne
The conversation

What should you ask a past client?

Not whether they were happy. Almost everybody says yes to that question, because by the time you are speaking to them they are living in a new house and the difficult months have receded.

Ask instead about specifics. Did the final cost match the contract, and if not, why not? How were variations priced and how quickly were they approved? Did the programme hold, and if it slipped, how were you told? What happened the first time you raised a defect?

Then ask the two questions that produce the most honest answers. What is the one thing you would do differently. And would you use them again, knowing what you know now.

Somebody currently mid build is worth even more than somebody finished, because they have no reason to rationalise the experience yet and every reason to describe it accurately. If a builder can only offer clients who completed years ago, that in itself is information.

Warning signs

When should you walk away?

Pricing that expiresAny pressure to sign at a first appointment is a sales technique. A genuine quote will still be honoured next month, and a builder who says otherwise is telling you about their process.
Only willing to price a generic jobAnyone insisting on quoting a generic scenario is postponing the awkward figures until your deposit has already changed hands.
Evasiveness about the entityIf the name on the quote, the registration and the contract are not obviously the same company, stop and get advice before proceeding.
No documents, only reassuranceWarm assurances are free. Contracts, specifications and certificates are the things that will actually govern your project.
Choosing FAQ

Questions about choosing a builder

Run this process on us. We would rather be chosen by somebody who checked properly than by somebody who liked the display home.

Ask us about your build
What is the single most useful thing to ask?
What is not included in this price, followed by a request for the answer in writing. It is difficult to answer vaguely, it reveals the scope of the quote immediately, and the manner of the response tells you a great deal about how the rest of the relationship will run. Almost every unpleasant surprise in a build traces back to something nobody explicitly said was excluded.
How many builders should I get quotes from?
Three is usually enough, provided you give all three the same brief and the same block and require the same scope. More than that produces diminishing returns and a great deal of admin. Fewer than that leaves you without a reference point. What matters far more than the number is that the quotes are genuinely comparable.
Should I choose the cheapest quote?
Only after you have established that it covers the same scope, which frequently it does not. The common differences are site works based on an allowance rather than testing, categories rather than named products, a larger allowance total, and finishing items excluded. Once those are equalised, the cheapest quote is often no longer the cheapest. If it still is, and the other checks pass, then yes.
How do I check the registration properly?
Look the company up on the Victorian Building Authority's searchable register. Three things need to line up: the registration is live, it extends to domestic work, and the entity holding it is word for word the one printed on your contract. That third comparison takes sixty seconds, is routinely skipped, and becomes the decisive detail should anything ever end up in dispute.
What if a builder will not give me client contacts?
Ask a second time and explain why you are asking. There are legitimate privacy reasons an individual client may decline, but a builder who cannot produce anybody at all from the past twelve months is describing either their volume of work or their client relationships. Neither explanation is encouraging, and you are entitled to weigh it.

Run the process on us

Ask for the registration number, a sample contract, the full specification, the allowance total and client contacts. We will send all five, and we would encourage you to ask the same of everyone on your list.

Leave a Reply

Your email address will not be published. Required fields are marked *