How to Choose a New Home Builder in Melbourne
Knowing what to check is the easy part. Actually doing it means requesting specific documents, asking questions in a form that cannot be answered vaguely, and being willing to walk away from a builder who will not answer them. This is how to run that process.
Why do most people choose badly?
Because the process is designed to be pleasant rather than informative. You visit display homes, you are shown finishes at their best, you are given a headline figure, and you are asked how soon you would like to start.
None of it is dishonest. Display homes are built to show what a builder can do at their best, and there is nothing wrong with presenting your strongest work. The difficulty is simply that it answers a question you were not really asking. Nothing in that sequence tells you what you actually need to know, which is how this company behaves when something goes wrong nine months from now. Display homes do not answer that. Renders do not. Neither does a friendly consultant.
The information that does answer it is documentary and it is available, but only if you ask for it specifically. A contract, an inclusions specification, an insurance certificate, a registration number and the phone number of somebody who has finished a build.
The good news is that requesting those five things is itself a test. A builder confident in their work produces them readily. Should someone hedge, postpone, or explain at length why such paperwork cannot be shared at this stage, you have learned more than any glossy brochure would have conveyed.
What should you request, and what should you see?
Five requests, and what a satisfactory response actually looks like in each case.
The registration number
Request the licence number alongside the full company name. Reassuring: both arrive without hesitation and correspond. Concerning: only a marketing name offered, or digits registered to a different corporate entity than the one preparing your agreement.
A sample contract
Ask to read one before you are asked to sign anything. Good answer: a recognised industry contract, sent without fuss. Poor answer: reluctance, or an in house document with unfamiliar limitation clauses.
A full inclusions specification
Good answer: brands and model numbers, room by room, with quantities. Poor answer: categories, adjectives, and the phrase or similar attached to everything.
The allowance schedule
Ask for every prime cost and provisional sum item with its value and total. Good answer: a short list with realistic figures. Poor answer: reluctance to total them, or a total that represents a large share of the price.
Client contacts
Ask for two who finished within the last year and one currently building. Good answer: names and numbers, with permission. Poor answer: testimonials instead, or only clients who finished years ago.
How do you interpret what you are told?
Five common responses and what each one usually means in practice.
| What you hear | What it often means | What to do |
|---|---|---|
| We include a generous site cost allowance | No soil test has been done on your block | Ask for testing before contract, or treat the figure as unknown |
| That is a standard inclusion | It may be standard for them, not for the industry | Ask for the brand and model in writing |
| This price is only available today | A sales tactic rather than a commercial reality | Take the quote away and think about it regardless |
| We can sort the details later | Details settled after contract are settled on their terms | Settle what you can before signing |
| Our clients are very private | Possibly true, possibly nobody willing to speak | Ask again, and note the answer either way |
Swipe the table sideways to see every column.
The five checks themselves are set out on our comparing builders page.
What should you ask a past client?
Not whether they were happy. Almost everybody says yes to that question, because by the time you are speaking to them they are living in a new house and the difficult months have receded.
Ask instead about specifics. Did the final cost match the contract, and if not, why not? How were variations priced and how quickly were they approved? Did the programme hold, and if it slipped, how were you told? What happened the first time you raised a defect?
Then ask the two questions that produce the most honest answers. What is the one thing you would do differently. And would you use them again, knowing what you know now.
Somebody currently mid build is worth even more than somebody finished, because they have no reason to rationalise the experience yet and every reason to describe it accurately. If a builder can only offer clients who completed years ago, that in itself is information.
When should you walk away?
Questions about choosing a builder
Run this process on us. We would rather be chosen by somebody who checked properly than by somebody who liked the display home.
Ask us about your buildWhat is the single most useful thing to ask?
How many builders should I get quotes from?
Should I choose the cheapest quote?
How do I check the registration properly?
What if a builder will not give me client contacts?
Run the process on us
Ask for the registration number, a sample contract, the full specification, the allowance total and client contacts. We will send all five, and we would encourage you to ask the same of everyone on your list.