House & land

House and Land Packages Melbourne, priced honestly

A house and land package pairs a block of titled or registering land in a growth estate with a new home designed to fit it, on a fixed-price contract. Unlike a locked package, we let you keep control of the design and inclusions, and we cost the site works before you sign, so the figure on your contract is the figure you settle on.

Site costs quoted upfront Your design, not a locked plan VBA registered
House and land package home completed in a Melbourne growth estate
Two contracts, one teamLand and build, coordinated
How it works

How do house and land packages work in Melbourne?

A house and land package is not one purchase. It is two contracts that run side by side: a land contract with the developer selling the lot, and a building contract with the builder constructing your home. Understanding that split is the single most useful thing a first-time buyer can learn, because it explains how the deposits, the stamp duty and the timing all work. It also explains why two house and land Melbourne quotes can look similar and behave completely differently once you are committed.

You pay a deposit on the land and settle it like any land purchase. Stamp duty is generally assessed on the land value only, not on a finished house, which is why building new tends to cost less in duty than buying an established home of the same end value. The building contract sits separately, and your lender draws it down in stages as the home goes up.

Because the two contracts are separate, they can also fall out of step. Land that has not registered yet cannot settle, and a build cannot start on land you do not own. We keep both timelines in view so your finance approval, your settlement and your site start line up rather than expiring on each other.

New house and land homes on a completed street in a Melbourne growth corridor estate

A locked package

The version most display villages sell. The home is fixed to the lot and the price looks simple.

  • One advertised figure, easy to compare at a glance
  • Design already matched to the lot dimensions
  • Changing the layout is limited or charged heavily
  • Site costs and upgrades often sit outside the headline

How we do it

You choose the lot, then we design and price the home around it and around you.

  • Layout, storeys and inclusions are yours to set
  • Site costs assessed on your actual lot before contract
  • Estate design guidelines checked and allowed for
  • One fixed-price contract you can budget against
Land status

What is the difference between titled and registering land?

Titled land is registered and ready to build on now. Registering land is sold before its title issues, so the wait sits between you and your site start. It is the detail that most often derails a build timeline.

What to checkTitled landRegistering land
Can you settle now?Yes, settlement usually within weeksNo, only once the plan of subdivision registers
When can building start?Soon after settlement and permitsAfter registration, settlement, then permits
Typical wait before a site startShort and predictableMonths, and sometimes longer than advertised
Finance approvalStandard approval periods usually sufficeApprovals can expire and need reissuing
PriceOften higher, you are paying for certaintyOften cheaper, you are carrying the timing risk
Sunset clauseNot applicableSets a date the contract can be ended if title has not issued

Swipe the table sideways to compare both columns.

Always read the sunset clause and the estimated registration date in the land contract. Ask what happens if registration is late, and confirm your lender will still honour approval at that point.

Turnkey

What does a turnkey house and land package actually include?

Turnkey should mean you can open the door and move straight in. In practice the word is used loosely, so treat it as a question rather than a promise, and check these items line by line on any quote.

Floor coverings throughoutNot just tiles to the wet areas, with carpet listed as an upgrade later.
Driveway and pathsConcrete to the garage and to the front door, finished to estate requirements.
Fencing and gatesSide and rear fencing, which many estates require within a set period after handover.
Landscaping to the frontTurf, garden beds and plants, again often a condition of the estate covenant.
Window furnishingsBlinds to every window, not a token allowance for the living area.
The small finishing itemsLetterbox, clothesline, TV points, flyscreens and door hardware add up quickly.

If a package is not turnkey, budget for these separately. Buyers who forget fencing and landscaping are the ones who move in and then find another spend waiting. See our new home designs and inclusions for the full list we build to.

The honest version

Are site costs included in a house and land price?

With us, yes. We assess your lot, order the soil test and survey, then price the site works into the contract before you sign. That is the difference between a number you can plan around and an advertised figure that grows once the engineering comes back.

Estate lots are usually more predictable than established blocks, because the developer has already done the bulk earthworks and brought services to the boundary. Predictable is not the same as free, though. The table shows what still varies from lot to lot, and why two neighbouring blocks can be priced differently.

Read the full breakdown in our cost to build a new home guide, which explains the 'from' price trap in detail.

Cost componentHow it is handled
Soil classification and slabSoil test first, slab engineered to the result
Cut and fill on a graded lotMeasured from the survey, priced before contract
Retaining walls to boundariesIdentified early, since level changes between lots are common
Service connectionsWater, sewer, power, gas and NBN from the boundary
Estate design requirementsFacade and material rules allowed for, not added later
Council and permit feesItemised, including the building permit and insurance

Every quote is worked out from your lot, your soil report and the design you choose.

First home buyers moving into their new house and land package home in Melbourne
First home buyers

Can first home buyers use the First Home Owner Grant on house and land?

Yes. A house and land package is a brand new home, so eligible first home buyers can claim the First Home Owner Grant on the build. This is a large part of why growth-corridor packages attract so many first-time buyers, and why they can be more achievable than they look on paper.

There is a second saving that gets less attention. Because duty is generally calculated on the land rather than a completed house, the amount payable on a package is usually well below the duty on an established home at the same finished value. Add the grant, and the gap widens further.

These figures move. The property caps, grant amount and duty thresholds are reviewed periodically, so as at 2026 check what applies on the day you sign with the State Revenue Office Victoria before you budget on them. We walk through eligibility with you in plain language on our first home buyer new homes page.

Where we build

Which growth corridors do we build house and land in?

House and land packages Melbourne wide are concentrated in three growth corridors: the west, the north and the south east. Every house and land growth corridor has its own frontages, covenants and buyer mix, so a plan that works beautifully in one can be the wrong shape for another.

Western corridor

Typical frontage 10m to 14m

The busiest new-home corridor in the state. Flat, regular lots suit efficient single-storey designs, and stock moves quickly through the newer estate stages.

Northern corridor

Typical frontage 12m to 16m

A mix of compact lots and larger family blocks. Several estates here are still releasing in stages, so land status matters more than usual when you compare prices.

South east corridor

Typical frontage 12.5m to 16m

The Casey and Cardinia growth belt, popular with families upgrading from a first home. Wider lots make double-storey and four-bedroom designs more workable.

Before you sign

What should you check before you commit to a lot?

Most house and land Melbourne buyers choose the block first and think about the home second. That order is fine, as long as you know what the block will let you build. Six things decide that, and all six are knowable before you pay a deposit.

Frontage and depthFrontage decides how much house fits beside the garage. Below about 12.5m, a double garage and a separate entry start competing for the same width.
OrientationA block with the rear facing north gives your living areas winter sun for free. South-facing living can still work, but the plan has to be drawn for it.
EasementsA drainage or sewer easement along a boundary is land you cannot build over. It can push the footprint sideways and reshape the whole layout.
Fall across the blockLevel change between the high and low corners drives cut and fill, and can mean retaining walls along a boundary you share with a neighbour.
Services at the boundaryConfirm water, sewer, power, gas and telecommunications are brought to the lot, and check which side, because the connection run is a real cost.
Stage and registration dateNew house and land packages are released in stages, so the lot you like may sit in a stage that has not registered. Ask for the estimated date in writing.

Send us a lot plan before you commit and we will tell you what it will comfortably take, and what it will fight you on. It costs you nothing and it is far cheaper than discovering the problem at tender.

Estate guidelines

What do developer design guidelines control?

Nearly every growth estate applies its own design guidelines on top of council requirements, and they are enforced through the land contract rather than the planning system. They exist to protect the look of the street, which is good for resale, but they do shape what you can build and what it costs.

Expect rules covering the facade materials and how much of the frontage must be rendered or brick, a minimum floor area, garage width and setback, roof pitch and colour ranges, driveway finish, fencing style, and a deadline for completing landscaping after handover. Some estates also restrict repeating the same facade within a certain distance on the same street.

We read the guidelines for your estate before we price your home, so the design that goes into your contract is one the developer will actually approve. Finding out at approval stage is the expensive way to learn this.

Overhead view of house and land lots in a Melbourne growth corridor estate
Timeline

How long does a house and land build take?

On titled land, most buyers are in their home inside a year. On registering land, add the wait for the title before anything else can begin.

1
Land securedDeposit paid, contract reviewed, registration date confirmed
2
Design and tenderHome matched to the lot, site costs and inclusions fixed
3
SettlementLand settles once titled, finance drawn for the build
4
PermitsEstate approval, building permit and insurance issued
5
Build to handoverBase, frame, lock-up, fixing, then your keys
Why us

Why choose us for house and land packages in Melbourne?

We are new home builders in Melbourne who treat a package as a build, not a product on a shelf.

The price holds

Site costs and estate requirements are priced before you sign, then held to handover. Only variations you request can move the figure.

Designed to your lot

Frontage, orientation and easements shape the plan. We work to the block you bought rather than squeezing a display home onto it.

Land contract read, not skimmed

We go through registration dates and sunset clauses with you, so your build plan is based on a realistic start date.

Credentials you can check

Our Victorian Building Authority registration is current, and domestic building insurance is taken out for every package before work starts.

Finance stages explained

We map progress payments against the build so you know what is drawn and when, and what you pay interest on along the way.

One contact throughout

The same person from first quote to handover, so nothing is lost between a sales desk and a site team.

House and land FAQ

House and land questions we answer most

Short answers on contracts, land status, grants and cost. If your question is about a specific lot, send us the plan and we will look at it with you.

Ask about your lot
How do house and land packages work in Melbourne?
A package is two contracts running together: a land contract with the developer and a building contract with the builder. You pay a deposit on the land and settle it separately, while the build is drawn down in stages by your lender as construction progresses. Stamp duty is generally assessed on the land value rather than a finished home. Because the contracts are separate, the land must be titled and settled before your builder can start on site.
What is the difference between titled and registering land?
A titled lot has completed its subdivision process, which means it can change hands quickly and your builder can move once permits are issued. Registering land is sold before its plan of subdivision is registered, so settlement waits on the title, which can take months and sometimes runs past the estimate. Registering lots are often cheaper because you carry the timing risk. Check the sunset clause, which sets the date either party can end the contract if title has not issued.
Can first home buyers use the FHOG on house and land?
Yes. The build is a brand new home, so eligible first home buyers can claim the First Home Owner Grant, and duty is generally calculated on the land rather than a completed house. Together those two savings are the main reason growth-corridor packages are so popular with first-time buyers. The State Revenue Office Victoria reviews the amounts, property caps and duty thresholds periodically, so check what applies on the day you sign rather than trusting an older figure.
Are site costs included in a house and land price?
In our contracts, yes. We order the soil test and survey, then price the slab, any cut and fill, retaining and service connections before you sign, and hold that price. Many advertised package prices exclude these, which is why a figure can climb after the engineering comes back. Ask any builder whether their quote is based on your actual soil report or on a standard allowance.
What does turnkey mean in a house and land package?
Turnkey should mean the home is complete enough to move into on handover day, including floor coverings throughout, blinds, driveway, paths, fencing and front landscaping. The word is not regulated, so packages advertised as turnkey vary widely. Ask for the inclusions list and check for the finishing items buyers forget: letterbox, clothesline, flyscreens and TV points.
Can I change the home design on a package?
With us, yes. You choose the lot and we design and price the home around it, so layout, storeys and inclusions are yours to set within the estate guidelines. Structural changes are easiest before tender is finalised, because they affect the engineering and the price. Locked packages from display villages usually allow far less, which is worth knowing before you compare two quotes as if they were the same thing.
How long does a house and land build take?
On titled land, allow roughly four to six months on site for a single-storey home and longer for double storey, plus the lead-up for design, tender, finance and permits. On registering land, add the wait for the title before any of that can start, which is where most package timelines stretch. We give you a stage-by-stage schedule with your fixed-price quote.
Do I need to use the builder the land developer recommends?
No. Buying a lot in an estate does not tie you to a particular builder, even when the land is marketed alongside one. Your home does need to meet the estate design guidelines, which we check before pricing. You are free to compare builders on contract, inclusions and site-cost honesty, and we would encourage it.

Found a lot? Let us price the home on it

Send us the estate, the lot number and your budget. We will check the land status and design guidelines, then come back with a fixed-price quote that has site costs already in it.