Your land, your home

Build on Your Own Land Melbourne, start to finish

If you already own land in Melbourne, an empty lot or a block with an older house on it, you can build a new home there instead of buying a package somewhere else. We assess the block, deal with demolition and the permits, then build under a fixed-price contract, so you end up with a new home in the street you already chose.

Demolition and permits managed Site costs quoted upfront VBA registered
New home built on an existing block in an established Melbourne street
Two starting points

Empty lot or knockdown rebuild?

Owners come to us from two very different positions, and they run on different timelines and budgets.

The first is a vacant block, perhaps inherited, subdivided off a larger parcel, or bought years ago and held. Nothing needs removing, so the work begins at design and permits.

The second is a property you already live in or rent out, where the existing house has reached the end of its useful life. Here the project starts earlier: the house has to be assessed, disconnected, demolished and cleared before a slab can go anywhere near the ground.

Both give you the same result, a brand new home on land you already hold. The difference is roughly two to three months of extra work at the front, and a separate line in the budget.

New home under construction on a knockdown rebuild site in Melbourne
Compare

How do the two paths differ in practice?

Same finished home, different first chapter.

What changesVacant blockKnockdown rebuild
Where the job startsDesign and permitsAssessment, disconnection and demolition
Extra approvalsBuilding permit, planning if overlays applyDemolition permit as well, sometimes planning consent to demolish
Added costNone beyond the usual site worksDemolition, disconnections, asbestos removal where present
Timeline impactStandardRoughly two to three months longer at the front end
Where you live meanwhileWherever you are nowYou must move out before work begins
SalvageNot applicableBricks, slate, fixtures and timber can sometimes offset cost

Swipe the table sideways to see every column.

We price both paths the same way: assess the block first, then quote. Our guide to what a new home costs breaks every line of that down.

Block assessment

What do we check on your block before quoting?

An established block carries constraints an estate lot never has. These six determine what can be built and what it will cost to build it.

01

Soil and slope

A soil test sets the slab design, and the fall across the block decides whether we cut, fill or step the floor level. Older inner suburbs often sit on reactive clay.

02

Overlays on the title

Heritage, neighbourhood character, vegetation protection and bushfire overlays all change what you may build. They are the single biggest variable between suburbs.

03

Easements and sewer

A drainage or sewer easement is land you cannot build over. Older blocks frequently have one down a boundary, and a sewer branch can sit awkwardly under a proposed footprint.

04

Services and the crossover

We confirm water, sewer, power and gas positions, whether the power is overhead or underground, and whether the existing crossover can stay or must be rebuilt.

05

Site access

Narrow frontages, tight side access, steep driveways and street trees all affect how machinery gets in and how spoil gets out. Restricted access costs money.

06

Neighbours and boundaries

Boundary walls, existing retaining, overlooking and overshadowing rules under ResCode shape the design long before anyone pours concrete.

Most of our build-on-your-land work sits in the established east and bayside, where blocks are tightly held and Hawthorn, Camberwell, Balwyn, Brighton, Port Melbourne and Clayton owners rebuild rather than move. See all of the eastern suburbs we build in, or compare with a house and land package if you are open to a growth corridor.

Interior of a completed new home built on an existing Melbourne block
Demolition

What happens if there is a house to remove?

We manage it, and it is more procedural than most owners expect. The order matters, because skipping a step can hold up the whole project.

Services are disconnected and formally abolished first, which is a lead-time item with the utilities rather than something a demolisher can rush. Any asbestos is identified and removed by a licensed remover under its own controls. Only then does the machinery arrive.

Councils treat demolition as its own approval, and in some cases a planning permit is needed to demolish at all, particularly where a heritage or character overlay applies. We establish that early, because it determines whether you have a straightforward project or a six-month approvals conversation.

What does the demolition stage actually involve?

Six items, each with its own paperwork and its own lead time.

Service abolishmentWater, sewer, gas, power and telecommunications formally disconnected and capped by the relevant authority.
Asbestos assessmentHomes built before the 1990s are checked. Anything found is removed by a licensed remover and disposed of at a lawful site.
Demolition permitIssued by a building surveyor, with council consent required in some circumstances before it can be granted.
Protection worksWhere the build sits near a boundary, adjoining owners must be notified and their property protected during works.
Spoil and waste removalRubble, concrete and soil carted off site. Access width has a direct effect on how much this costs.
Site left clean and levelThe block is handed over cleared and ready for survey, set-out and the slab.
Worth knowing

What catches owners out on their own block?

Assuming no planning permit is neededVacant land with no overlays is often straightforward. Add a heritage or character overlay and the approval becomes the longest part of the project.
Budgeting demolition as one numberDisconnections, asbestos and spoil removal are separate costs and vary enormously by house age and site access.
Forgetting where you will liveOn a knockdown rebuild you are paying rent while also carrying the loan on the build. It is the same overlap first home buyers face, and it needs planning for.
Designing before checking the titleAn easement or a sewer branch can rule out the footprint you had in mind. We check the title and the service plans before anyone draws a plan.
Build on your land FAQ

Questions from owners building on their own block

Send us your address and we will tell you what your block will and will not allow before you spend anything on design.

Ask about your block
Can I build a new home on land I already own?
Yes. If the title is in your name and the block is zoned residential, you can build on it. What varies is how much approval is needed, which comes down to the overlays recorded against the title and the constraints on the site itself. We check the title, the service plans and the planning controls first, then design a home that fits both the block and the rules that apply to it.
What if there is an old house on my block?
Then the project begins with removing it. Services are formally abolished, any asbestos is removed under licence, and a demolition permit is issued before machinery starts. Depending on the overlays on your title, council consent may also be needed to demolish. Allow roughly two to three months for that front section of the project, and budget it separately from the build.
Do I need a demolition permit before building new?
Yes, a demolition permit is required and it is separate from the building permit for the new home. It is issued by a registered building surveyor. Where a heritage or neighbourhood character overlay applies, council consent to demolish may be needed first, and that step can take considerably longer than the permit itself. We identify which applies to your block at the assessment stage.
How are site costs worked out on my own land?
From your actual block rather than an allowance. We order a soil test and a feature survey, then price the slab to the soil classification, any cut and fill to the measured fall, retaining where levels demand it, service connections from their real positions, and access constraints as they exist. That figure goes into the contract and is held, so the cost does not move once work begins.
Is it better to knock down and rebuild or renovate?
It depends on how much of the existing house is genuinely worth keeping. Renovating suits a structurally sound home with good bones where you want to change part of it. Rebuilding usually makes more sense when the layout is wrong throughout, the wiring and plumbing need replacing anyway, or the house is not oriented for light. A new build also comes with a fresh warranty and current energy requirements, which a renovation only partly delivers.
Can I stay in the house while you build?
Not on a knockdown rebuild, because the house has to come down before the slab goes in. You will need somewhere to live for the duration, and most owners rent nearby. On a vacant block the question does not arise. We give you a stage-by-stage schedule with the quote so you can line up a lease against real dates rather than guesses.

Send us your address and we will assess the block

Tell us where the land is and what is on it now. We will check the title, the overlays and the services, then come back with a fixed-price quote that already has the site works in it.